← All projects

Amenities floor refurbishment

New dark vinyl flooring in an amenities building with tools and finishing work visible

A closer look

Multitrade refitted the steel floor framing and relaid the vinyl flooring in a camp amenities building. The photographs show two stages of the refurbishment: the exposed steel frame before the floor was reinstated, followed by the newly laid vinyl. Tools and unfinished details remain visible in the later photograph, documenting the floor renewal before the surrounding finishing work was complete.

Photography: Multitrade Group project library.

Construction & RefurbishmentDiscuss similar work
Work
Amenities building floor refurbishment
Scope
Steel framing refit and vinyl floor renewal
Photo stages
Exposed framing and vinyl laid
Steel floor framing exposed inside an amenities building during floor refurbishment
Steel framing refitted — Exposed steel floor framing before the floor was reinstated.
New dark vinyl flooring with coved edges, tools and openings visible during finishing work
New vinyl laid — The renewed vinyl floor, with tools and finishing details still visible.

The first photograph shows the steel refit stage. The later view shows the vinyl laid, with finishing work continuing.

Contact

Discuss your project

Tell us what you need and where the work is. Our team will get in touch to discuss your project.

Address
6 South Trees Drive, Gladstone QLD 4680

So we can call or write back.

Town or mine site is enough.

We use these details to respond to your enquiry. How we handle your information.