Keeping Place, Blackwater Mine

Case study

Installed building at sunset with its covered deck, access ramp and curved concrete path

The project

The Keeping Place project brought a 12 × 6 metre building complex and covered deck together with the surrounding site at Blackwater Mine. Multitrade Contracting positioned, joined and secured the building modules, then fabricated and installed access ramps, landings, handrails and decking. The installation also included concrete footings, steelwork and awning construction, with engineering and specialist plumbing coordinated as part of the wider delivery. These photographs show the installed building and access details alongside awning work in progress.

Photography: Multitrade Group project library.

Building Installation & Site EstablishmentDiscuss similar work
Project
Keeping Place
Location
Blackwater Mine, Queensland
Building
12 × 6 metre complex with covered deck
Scope
Building placement, ramps, decking and awning works

One group, connected delivery

From building supply to site installation

Multitrade Building Hire

Multitrade Building Hire supplied the building complex as part of the group project.

Explore Multitrade Building Hire

Multitrade Contracting

  • Building placement, joining, levelling and welding to supports.
  • Fabricated ramps, landings, handrails and composite decking.
  • Concrete footings and awning steelwork, roofing and gutters.
  • Engineering and specialist plumbing coordination.

Project photographs show the installed building and access details alongside awning work in progress.

Contact

Discuss your project

Tell us what you need and where the work is. Our team will get in touch to discuss your project.

Address
6 South Trees Drive, Gladstone QLD 4680

So we can call or write back.

Town or mine site is enough.

We use these details to respond to your enquiry. How we handle your information.