The project
Multitrade completed a staged mining camp relocation, moving 18 accommodation buildings and two laundries from an existing site through yard refurbishment to installation at a new location. Demobilisation included civil demolition and removal of the existing awnings. At the Multitrade yard, preparation included detailed cleaning, internal fit-out changes and new furniture, together with coordinated specialist electrical and plumbing upgrades for the new mining specifications. The buildings were then transported to the new site and installed on screw piles. Multitrade supplied nine new steel-chassis deck modules with composite timber decking, erected the deck awnings onsite, and delivered concrete pathways, stairs and landings to connect the accommodation areas. The photographs document foundation and deck installation, concrete work and later views of the installed access.
Photography: Multitrade Group project library.
Building Relocation & DemobilisationDiscuss similar work- Buildings relocated
- 18 accommodation buildings and two laundries
- Building dimensions
- 14.4 × 3.4 m each
- New deck modules
- Nine × 14.4 × 3 m, steel chassis with composite timber decking
- Installation
- Screw piles, deck awnings, concrete pathways, stairs and landings
- Delivery stages
- Demobilisation, yard refurbishment and new-site installation
- Refurbishment scope
- 80 accommodation rooms and two laundries






The project was completed as a staged relocation. These photographs show installation progress and later installed access; individual views are not a record of formal handover.
Contact
Discuss your project
Based in Gladstone, working across QLD, NT and NSW. Tell us what you need and where the work is.
- Phone
- (07) 4979 2333
- Address
- 6 South Trees Drive, Gladstone QLD 4680