← All projects

Gatehouse installation and access

Dark-clad gatehouse with a screened end platform during crane placement onto steel posts

A closer look

This 10.5 × 3.4 m gatehouse formed part of a Multitrade Group supply-and-installation package delivered through Multitrade Building Hire. Site work included preparing footings, fabricating additional steel posts, positioning and securing the building, and fitting stairs and handrails. A specialist crane provider supported building placement. The photographs follow the lift and a later stage with access fitted, showing how the building, supports and entry come together while surrounding construction continues.

Photography: Multitrade Group project library.

Building Installation & Site EstablishmentDiscuss similar work
Building
10.5 × 3.4 m gatehouse
Site work
Footings, steel supports and building securing
Access
Fabricated stairs and handrails
Photographed stage
Crane placement and later access installation

Matched photographs from one gatehouse installation. The later access view still shows surrounding construction; these photographs do not represent whole-site handover.

Contact

Discuss your project

Based in Gladstone, working across QLD, NT and NSW. Tell us what you need and where the work is.

Address
6 South Trees Drive, Gladstone QLD 4680

So we can call or write back.

Town or mine site is enough.

We use these details to respond to your enquiry. How we handle your information.