← All projects

6 North workers village

Case study

Covered concrete walkway between modular buildings with yellow-railed stairs and visible building tie-down chains

The project

Multitrade built the covered areas, laid the concrete slabs and installed stair access for the 6 North mining workers village. The work also included tying down and securing the buildings. Roofed walkways connect the rows of buildings, with stairs and landings providing access from the concrete paths. The photographs show the installed access and covered areas alongside a view of roofing work in progress.

Photography: Multitrade Group project library.

Building Installation & Site EstablishmentDiscuss similar work
Project
6 North workers village
Scope
Covered areas, concrete slabs, stair access and building tie-downs

Views of the covered areas, concrete paths and installed access. Some photographs show roofing work and site activity continuing.

Contact

Discuss your project

Based in Gladstone, working across QLD, NT and NSW. Tell us what you need and where the work is.

Address
6 South Trees Drive, Gladstone QLD 4680

So we can call or write back.

Town or mine site is enough.

We use these details to respond to your enquiry. How we handle your information.