← All projects

Ramp and access upgrades

Ramp under construction, with exposed steel floor framing and white handrails beside an existing building

A closer look

Multitrade Contracting built a new ramp as part of building access upgrades. These construction-stage photographs show the steel ramp and landing frame, supporting posts and fitted handrails beside an existing building. The walking surface had not yet been installed when these photographs were taken.

Photography: Multitrade Group project library.

Ramps, Decks & AwningsDiscuss similar work
Service
Ramps, decks & awnings
Work
New ramp and building access upgrades
Photo stage
Under construction
Steel ramp and landing frame with white handrails under construction
Under construction — Ramp and landing framing with handrails fitted, before the walking surface was installed.
Side view of a ramp under construction, showing uncovered floor framing and handrails
Under construction — A second view along the exposed ramp frame and handrails during construction.

Both photographs show the ramp during construction, before decking was fitted.

Contact

Discuss your project

Tell us what you need and where the work is. Our team will get in touch to discuss your project.

Address
6 South Trees Drive, Gladstone QLD 4680

So we can call or write back.

Town or mine site is enough.

We use these details to respond to your enquiry. How we handle your information.