← All projects

Dingo State School ablution installation

Case study

School amenities building with a covered timber deck, access ramp and metal handrails

The project

Multitrade installed a 14.4 × 3 metre ablution building at Dingo State School, together with a 14.4 × 2.4 metre deck, a custom PWD access ramp and two sets of access stairs. The covered deck links the amenities entrances, while the ramp and stairs connect the facility to ground level. Despite inclement weather and a fixed school-year deadline, the facility was delivered on time and on budget for the new school year. The photographs follow crane placement and framing through to later views of the roofed deck, ramp and stairs.

Photography: Multitrade Group project library.

Building Installation & Site EstablishmentDiscuss similar work
Project
Dingo State School
Building
14.4 × 3 m ablution facility
Deck
14.4 × 2.4 m
Access
Custom PWD ramp and two sets of stairs
Outcome
Delivered on time and on budget for the new school year

Crane placement and exposed framing are construction-stage views. Later photographs show the installed deck, ramp and stairs, with some site equipment and temporary fencing still present.

Contact

Discuss your project

Based in Gladstone, working across QLD, NT and NSW. Tell us what you need and where the work is.

Address
6 South Trees Drive, Gladstone QLD 4680

So we can call or write back.